News

Drilling of KEM ONE PA-30 sidetrack with snubbing unit completed

Salt Solution Mining, Vauvert (Fr.), September 2012; On the 30th of September Well Engineering Partners BV & KEM ONE have released the Hydraulic Workover Unit (HWU) HWT600 owned by Balance Point Control (BPC) read more »

Finish KEM ONE PA-32/33

Salt Solution mining, Vauvert (Fr.) On the 21st of September Well Engineering Partners BV & KEM ONE have released the rig from the drilling location PA32/33. The doublet is situated in the Parrapon concession read more »

Drilling Tulip Oil DKK04 well

Oil and Gas, Donkerbroek NL, 03-07-2012 WEP proudly announces that after a period of preparation drilling of the first new gas well of Tulip Oil Netherlands has started. The well (DKK-04) will be situated in Donkerbroek read more »

Hydraulic workover Frisia Harlingen.

Salt solution mining, Harlingen (NL) , 05-07-2012 After a period of preparation, planning and wireline operations, a hydraulic workover operation started (July 4th) on the BAS-3 well of Frisia (ESCO). read more »

Start drilling Arkema PA32

Salt solution mining Vauvert 07-06-2012 – WEP proudly announces that after a period of preparation drilling of the Arkema brine production well PA-32 has started. The well will be situated in the Parrapon concession read more »

WEP & Sterling Resources finalized drilling at F17 in Northsea.

Oil and Gas, Hoogeveen NL, 10-02-2012. On the 9th of February Well Engineering Partners BV & Sterling Resources Ltd. have released the rig Maersk Resolute from the drilling location F17-09. read more »

IFWEP assists Aardwarmte Den Haag with installation ESP and Injection Valve.

Geothermal Energy, Hoogeveen NL, 10-01-2012 Well Engineering Partners B.V. is pleased to announce that in week 1 and 2 of 2012 the Electrical Submersible Pump (ESP) and the Injection Valve (IPCV) were installed respectively in HAG-GT-01 and HAG-GT-02. read more »

Well Engineering Partners announces finalization of geothermal doublet in Koekoekspolder (IJsselmuiden)

Geothermal energy, HOOGEVEEN NL, 5-01-2012 – Well Engineering Partners B.V. is pleased to announce that in December 2011 the first geothermal doublet in Koekoekspolder has been finalized. In December 2011 the last operational read more »