News

Successful Geothermal Doublet for Aardwarmte Vogelaer

November 2016, Poeldijk, Netherlands
Drilling and testing operations are finished for Aardwarmte Vogelaer. Wells PLD-GT-01 and PLD-GT-02 were drilled and tested successfully using the DrillTec Vario rig. Operations started on August 18th read more »

Drilling operations for geothermal energy have started for Aardwarmte Vogelaer

August 2016, Poeldijk, The Netherlands
After a period of intensive preparations drilling for geothermal heat has started in Poeldijk, the Netherlands. The DrillTec VDD370.2 VarioRig spudded the first well on august 18th 2016. Two wells read more »

VE-4 Workover Phase I

Veendam, NL, 6th of June 2016.
Well Engineering Partners has already provided various services for magnesium brine producing wells owned by Nedmag. One of the wells operated by Nedmag is VE-4, which was drilled in 1976 and completed read more »

Full access to BAS-3O cavern

April 2016, Frisia salt solution mining, Harlingen, the Netherlands.
Well engineering partners completed successfully a Hydraulic Workover Snubbing Operation. Within 20 days access of the production tubing was fully restored and the well read more »

Aardwarmte Vierpolders is in the newspaper

Source: (Dutch) Newspaper NRC, 29 April 2016
Warmteschat onder koude poldergrond
Tot vier kilometer diepte ligt in de bodem aardwarmte opgeslagen. In het slaperige Vierpolders staken tuinders miljoenen in winning read more »

A geothermal doublet for CLG Geothermie BV was drilled with success

April 2016, Grubbenvorst, The Netherlands
The doublet consists of two wells CAL-GT-04 and CAL-GT-05. GT-04 is the producer and GT-05 is the injector. A successful productivity test on GT-04 and the injection test on GT-05 provides good read more »

ECW B.V. signs 3 year contract with WEP

April 2016, Hoogeveen, the Netherlands
Energie Combinatie Wieringermeer Geomanagement (ECW) has signed a 3 years contract with Well Engineering Partners for support on drilling engineering activities related to geothermal energy and the read more »

Drilling for geothermal energy in Vierpolders: an update

March 2016, Vierpolders, The Netherlands
After a successful drilling project in Vierpolders in 2015 the first geothermal heat has been produced in early 2016. During the month February the system has been trial tested to fine tune all read more »