Geothermal: WEP is proud partner in the DRAGLOW Project

WEP is proud partner in the Draglow Project to Contribute to the Sustainable Heat Supply Sector Start: April 1st, 2021 End (expected): Q1 2024 Objective: Drag reduction in geothermal & district heating systems to lower investment and operational costs Depth (MD): n/a Depth (TVD): n/a Project Summary Consortium:DRAGLOW Location:n/a Wells:geothermal systems Start Engineering:April 1st, 2021 […]

Read more

Oil&Gas: Abandonment well and drilling sidetrack in Middle East

Abandonment current well and Sidetrack drilling Start engineering:Q1 2020 (Expected) End date: Q2 2021 Objective: Collect data and bring well into production Depth (MD): 5000 mMD Depth (TVD): 4800 mTVD Project Summary Client:Operator in the Middle East Location:Middle East Wells:Existing well Start Engineering:Q1 2020 (Expected) End:Q2 2021 Project Objective:Collect data and bring well into production […]

Read more

Salt: Frisia HVM-02 drilling

Salt well HVM-02 drilling Start Engineering: January 2018 End execution: November 2020 Objective: Design and drill an ERD salt well, from the FRISIA Havenmond location to the Havenmond concession. Depth (MD): 4950mDepth (TVD): 3021m Project Summary Client: FRISIA Location: Havenmond Wells: HVM-02 Start Engineering: January 2018 End Execution: November 2020 Objective: Design and drill a […]

Read more

Geothermal: Trias Westland second geothermal doublet

Engineering and drilling new geothermal doublet NLW-GT-03-S1 and NLW-GT-04 Start engineering: October 2018 End drilling: August 2020 Objective: Realise second geothermal doublet for Trias Westland. Depth (MD): 2600m; 3015m Depth (TVD): 2494m; 2401m Project Summary Client:Trias Westland B.V. Doublet/Triplet:Naaldwijk Wells:NLW-GT-03-S1 and NLW-GT-04 Start Engineering:October 2018 End Execution:August 2020 Project Objective:Realise second geothermal doublet for Trias […]

Read more